Engineering offices

On this page, you can download ready-to-use diagrams and work explanations to support your design, or log in to the Suunnittelukone design tool to create building-specific diagrams.

Engineer support: 010 286 2012

Our apartment-specific water meters are approved with a zero protection distance, meaning it is not necessary to have a straight pipe section before or after the meters.

However, we recommend following these protection distances whenever possible to ensure the best performance of the meters:

For a DN15 water meter, 75 mm from the branch.
For a DN20 water meter, 100 mm from the branch.

A ball valve, dirt trap, or an elbow right can be placed immediately in front of the fitting.

 

HYDROLINK Air

Design instructions for water metering systems

Work explanation

HYDROLINK Air (PDF)

Work explanation

HYDROLINK Air (DOCX)

Design instructions

HYDROLINK Air (PDF)

Design instructions

HYDROLINK Air (DWG)

Work explanation

Hydrolink Line AD-X (PDF)

Work explanation

Hydrolink Line (DOCX)

Design instructions

Hydrolink Line (PDF)

Design instructions

Hydrolink Line (DWG)

Work explanation

Hydrolink Line (DWG)

Work explanation

Hydrolink Line AD-X (DOCX)

Design instructions

Hydrolink Line AD-X (PDF)

Design instructions

Hydrolink Line AD-X (DWG)

Design instructions

Hydrolink Air (PDF)

Design instructions

Hydrolink Air (DWG)

Design instructions

Hydrolink Line (PDF)

Design instructions

Hydrolink Line (DWG)

For more information, please contact us

Key Account Manager, Marketing Manager
Otto Moberg
+358 10 286 2003
Technical Sales
Aki Karvinen
+358 10 286 2013