Engineering offices
On this page, you can download ready-to-use diagrams and work explanations to support your design, or log in to the Suunnittelukone design tool to create building-specific diagrams.
Engineer support: 010 286 2012
Our apartment-specific water meters are approved with a zero protection distance, meaning it is not necessary to have a straight pipe section before or after the meters.
However, we recommend following these protection distances whenever possible to ensure the best performance of the meters:
For a DN15 water meter, 75 mm from the branch.
For a DN20 water meter, 100 mm from the branch.
A ball valve, dirt trap, or an elbow right can be placed immediately in front of the fitting.
Wireless LoRa system (free online service)
HYDROLINK Air (PDF)
HYDROLINK Air (DOCX)
HYDROLINK Air (PDF)
HYDROLINK Air (DWG)
Wired M-Bus system (free online service)
HYDROLINK Line (PDF)
HYDROLINK Line (DOCX)
HYDROLINK Line (PDF)
HYDROLINK Line (DWG)
HYDROLINK Line (PDF)
HYDROLINK Line (DOCX)
HYDROLINK Line (PDF)
HYDROLINK Line (DWG)
Electrical measurement systems
Hydrolink Air (PDF)
Hydrolink Air (DWG)
Hydrolink Line (PDF)
Hydrolink Line (DWG)
Kokan ammattilaiset auttavat sinua kaikissa kysymyksissä